Construction & Renovation Project Overview
Location:
Scottsdale, AZ
Length:
9 Days
Estimated Completion Date:
8/17/17
Scope:
DWM was contracted to complete a full cafe remodel in Scottsdale, AZ. The project includes demo and FF&E work including painting, wallpaper installation, wood touch up, installation of menu boards, removal, and disposal of all items as required, and detailed cleaning of the café.
-
Remove both back and frontline cabinets and replace with new.
-
Remove back and frontline counter tops and replace with new Corian counter tops.
-
Replace current backsplash with Corian.
-
Remove the current café tiles and replace where trenching occurs.
-
Replace the menu boards and lens with new.
-
Replace the current lighting with new LED lights.
-
Add outlets for new café equipment.
-
Replace the current wallpaper with new café green stripe.
-
Add double door UCR.
-
Add UCF.
-
Add UCR.
-
Add Bake Oven.
-
Add Bunn Brewer.
-
Pull the Pepsi machine and all lines and replace with Ice bin.
-
Replace the wallpaper in the seating area.
-
Replace existing beverage cooler with new.
-
All 120V outlets will be converted to GFI.
-
Patch and paint the back room.
-
Refinish the café railing.
-
Replace the tile in the back room.
-
Replace the condiment bar with new.
-
Replace the trash enclosures with new.
-
Add Metro shelving in the back room.
-
Paint and patch all surfaces in the café.
-
Tile the service area with the black and while diamond tile pattern.