Construction & Renovation Project Overview
Location:
Little Elm, TX
Length:
7 Weeks
Estimated Completion Date:
6/7/2019
Scope:
The DWM Construction & Renovation team began bidding out this new build job in March 2019. DWM was awarded the contract to complete this 7 week project for a national financial client. The full construction/FF&E scope includes architectural plans, HVAC, electrical, plumbing, roofing, flooring, framing/drywall, painting. A DWM Construction & Renovation project manager will be on site for the duration of the project.
Scope of Work - Framing
- Install steel framing per plan set
- Brace all partition walls to ceiling or demising walls
Scope of Work - Concrete Trench
- Install Moisture barrier
- Install 1/2" Rebar on 2' grid pinned into existing concrete
- Pour 4" thick slab and trowel finish
Sheetrock, Door frames, Accoustic Ceiling
- Fire tape all demising walls
- Install 5/8 drywall to a minimum of 10'4" on all new partition walls
- Install 4 doors and required hardware per plans
- Install new harware on rear door
- Tape and finish to a smooth prime ready finish
- Install 2 x 4 grid for acoustic ceiling
- Install ceiling tiles
Painting
- Prime all walls with one coat of new drywall primer
- Apply two coats of paint to all walls in accordance with finish plan provided
- Apply two coats of paint to doors and doors framed
Flooring
- Install Armstrong VCT flooring in back of house per plans
- Install DWM supplied Carpet tile in Front of house
- Install 'Roppe' cove base in back of house
- Install DWM supplied carpet base in front of house
- Buff and wax VCT
Kitchenette
- Install kitchenette per plans